Case Study

These case studies highlight how GeoSitter's monitoring instruments, data management software and hydraulic jacks for pile load test excel in a number of projects.

Geotechnical Monitoring

Geotechnical monitoring solutions for bridge monitoring, high formwork support monitoring, tunnel monitoring, deep foundation pit monitoring, etc.

The automated pit monitoring system utilizes v...
Read More >>
GeoSitter combines structural health monitorin...
Read More >>
The system solution provided by GeoSitter can ...
Read More >>
​GeoSitter is committed to the research and de...
Read More >>
The real-time high formwork support monitoring...
Read More >>
The tunnel monitoring system independently dev...
Read More >>
GeoSitter's automatic monitoring and early war...
Read More >>
GeoSitter has introduced a Transmission Tower ...
Read More >>
In order to achieve unmanned and real-time aut...
Read More >>
GeoSitter technology is supported by a two-dim...
Read More >>

Pile Testing

Our CNAS Laboratory Certified hydraulic jacks and other pile testing equipment serve over 8,000 projects worldwide each year.
Once again, the Ougan Group was called upon to...
Read More >>
The Mumbai Trans Harbour Link (MTHL), also kno...
Read More >>
Recently Ougan engineers successfully complete...
Read More >>
Puerto Caucedo is the only deep-water containe...
Read More >>
Extensions are planned for berths 6, 7, 8 and ...
Read More >>
Catholic High School is an all-male Catholic H...
Read More >>
Ougan was very fortunate to have won the bid a...
Read More >>
Sudan livestock wharf is located near the Red ...
Read More >>
The Manila MRT Line 7 is an under construction...
Read More >>
Located in the heart of Malaysia’s South Johor...
Read More >>
Ougan is proud to be part of Saudi Arabia’s vi...
Read More >>
- Message -

Back Top