Project Summary

Name Baish Dam: Sahiba Gökçen International Airport 

Location: Kingdom of Saudi Arabia 

Date: 2016 

Client: Ministry of Water and Electricity 

Instrumentation Specialist: Triad Technical Services 

Consultant: GeoSitter

Introduction

The Mumbai Trans Harbour Link (MTHL), also known as the Sewri-Nhava Sheva Trans Harbour Link, is a project under-construction consisting of a 21.8 km freeway grade road bridge connecting the Indian city of Mumbai with Navi Mumbai, its satellite city. 

When completed this will be the longest sea bridge in India. The bridge will begin in Sewri, South Mumbai and cross Thane Creek north of Elephanta Island. The bridge will then terminate at Chirle Village near Nhava Sheva. The road from the bridge will be linked to the Mumbai Pune Expressway in the east, and to the proposed Western Freeway in the west. The sea link bridge will be a 6-lane highway, 27 meters wide, in addition to two emergency exit lanes, edge strip and crash barrier. 

The project is estimated to cost US$2.0 billion. The MMRDA awarded contracts for the project in November 2017 and construction began in April 2018 and is scheduled to be completed within four-and-a-half years. After opening, the MMRDA estimates that 70,000 vehicles will use the bridge daily.  

Based upon their years of experience in performing the load tests of large-scale sea-crossing bridges, Super Cell was awarded the pile foundation bearing capacity test for the Mumbai Trans Harbor Link. 

 

Super Cell India provides full scale testing and load cell assembly on five bored piles. The piles range in diameter from 1.45m to 2.15m with depth up to 45.5 meters. The load tests verify the designs for construction with the maximum test load at more than 100 MN in test load. 

 

The successful implementation of this project is a vital step for The Ougan Group to enter the bi-directional static load testing industry in India. With the establishment of Ougan Group India joint venture (Super Cell India LLP) in November 2018 we are well positioned to continue our success in India. 


Related Products
  • Conventional O-Type Hydraulic Jack
  • Heavy-duty O-type Hydraulic Jacks
  • S-Type Hydraulic Jack
Conventional O-Type Hydraulic Jack

>>High-strength forged cylinders, enhancing overall reliability.
>> Precision engineering for top performance.
>> Max. working pressure as high as 50MPa| 7252psi, max.stroke 150mm|5.91in.

Capacity
 

Stroke (mm)
 

Max. Pressure at Max. Load
 

Diameter of Single Jack (mm)
 
32T15050MPa108
42T15050MPa133
66T15050MPa159
86T15050MPa180
100T15050MPa194
120T15050MPa219
150T15050MPa245
300T15050MPa325


Heavy-duty O-type Hydraulic Jacks

>> High-strength forged cylinders, enhancing overall reliability.
>> Precision engineering for top performance
>> The maximum working pressure can be customized according to clients' requirements, with a maximum stroke of 175mm|6.89in.


Capacity
 

Stroke (mm)
 

Max. Pressure at Max. Load
 

Diameter of Single Jack (mm)
 
100T16070MPa (customizable)135
200T16070MPa (customizable)190
250T16070MPa (customizable)215
300T17570MPa (customizable)235
400T17570MPa (customizable)270
500T17570MPa (customizable)300
600T175 70MPa (customizable)330
700T17570MPa (customizable)360
800T17570MPa (customizable)380
900T17570MPa (customizable)400
1000T17570MPa (customizable)425
S-Type Hydraulic Jack

>> High-strength forged cylinders, enhancing overall reliability.
>> Precision engineering for top performance
>> Max. working pressure as high as 30MPa| 4351psi, max.stroke 150mm|5.91in.


Capacity
 

Stroke (mm)
 

Max. Pressure at Max. Load
 

Diameter of Single Jack (mm)
 
240T15030MPa370
320T15030MPa420
430T15030MPa470
530T15030MPa520
630T15030MPa570
730T15030MPa620
870T15030MPa670
1000T15030MPa720
1200T15030MPa770
1350T15030MPa820
- Message -

Back Top